HUATAO

How to Specify Flight Hand and Rotation for a Centre-Fed Split Screw

Give each screw section its own hand and discharge direction, and define rotation from a named viewing end.

KWS describes a food-processing loadout application that used a centre-fed screw to send material toward two discharges. Its undated case illustrates a split-flow layout. The required flow split and the exact handedness and rotation for another installation depend on its design.

Fix the observer’s reference first

Label End A and End B on the assembly drawing and show their relationship to the plant layout. Specify clockwise or counterclockwise as viewed from a named end looking along the shaft. Include an end-view rotation arrow and a side view with separate axial flow arrows from the centre inlet to each outlet. Verify the arrows against the intended drive direction and the approved assembly.

Side and end views of a centre-fed screw showing ends A and B, two flight sections, outward flow and a rotation reference viewed from End A.
Illustrative diagram

Label each section and the centre transition

Give each section its own part or position number, handedness and axial limits measured from a common datum. Mark where each flight starts at the centre, and define any gap, overlap or end clearance on the approved drawing. Require the supplier to show its handedness convention on the returned sketch. If either side can be installed in more than one orientation, identify the intended orientation on the parts and assembly instruction.

Accept geometry and flow at different stages

Use the part inspection to confirm handedness and dimensions for each section. Use assembly inspection to confirm placement and intended rotation, with any powered checks performed under the site’s approved procedure. If the process depends on a specified split, define the inlet conditions, measuring period and acceptable delivery to each outlet for the loaded system test. Include the marked assembly view with the flight RFQ.

Sources

Continue your review

Technical RFQ checklist