Coarse Feed and Fine Dosing: What Goes on the Screw Flight Drawing?
Specify coarse and fine dosing duties separately, then accept the parts and the complete feeder against their own requirements.
WAMGROUP’s 12 November 2026 MICRODEX announcement describes a system combining extraction, conveying, main feeding and micro-feeding. It illustrates two distinct dosing duties. The announcement gives no independent test results or basis for assigning particular flight geometry, materials or a mating arrangement to the pictured product.
Write two duty rows before issuing drawings
For coarse feed, record the material and the rate needed during the main delivery window. For fine dosing, describe the approach to the target and the allowable final dose error. Give both rows the relevant material condition, expected hopper levels and cleaning constraints. Link each duty to the actual screw or active zone on the approved system drawing. A single screw can serve more than one duty, so resolve the component count with the system designer.

Release each flight to its drawing
For each assigned screw or zone, give the supplier the revision, material, pitch schedule, diameter, section and handedness. Identify fit-critical transitions, clearances, surface requirements and end interfaces where they apply. Give each measurable requirement an acceptance method and identify whether it is checked on a loose flight or after assembly. Ask the supplier to return a drawing-based inspection record.
Assign dosing acceptance to the system integrator
Test the assembled system with representative material and an agreed weighing method. Record the main feed rate, switch point, final delivered mass and variation across cycles. Define hopper conditions and settings, and include cleaning or residual-material checks where required. Put the flight supplier’s dimensional evidence and the integrator’s dosing evidence in separate acceptance rows. Use the RFQ checklist to request the part scope and name the party responsible for system testing.